Step 9 of 15 · Safety

Record the safety paperwork

RAMS, inspections and the actions that come out of them are recorded as they happen, and Estimark holds the record rather than the verdict. A method statement is versioned, and each operative signs the version they were shown. Items on a legal inspection cycle sit in one list with the regulation and the interval on each: scaffolding every seven days under regulation 12 of the Work at Height Regulations 2005, an excavation at the start of every shift under regulation 22 of CDM 2015, lifting equipment on its LOLER 1998 thorough examination cycle. Anything raised on site becomes an action with a name against it and a date to be done by.

The statutory inspections list, with an overdue scaffold inspection at the top showing its seven-day interval and the regulation behind it, and an excavation due before every shift below.
The statutory inspections list, with an overdue scaffold inspection at the top showing its seven-day interval and the regulation behind it, and an excavation due before every shift below.
  1. 01

    What is a RAMS, and how do you keep the versions straight?

    A RAMS is the risk assessment and method statement for a task: what could hurt somebody, and how the work is sequenced so it doesn’t. Estimark versions each one and keeps an acceptance register beside it, so an operative signs the version they were actually shown. Issue a revision and it starts with no signatures, because inheriting yesterday’s would be a record of something that never happened.

    The RAMS register, described on screen as versioned risk assessments and method statements with an operative acceptance register. This demo account has none yet.
    The RAMS register, described on screen as versioned risk assessments and method statements with an operative acceptance register. This demo account has none yet.
  2. 02

    How do you keep a scaffold inspection record?

    You put the scaffold on the statutory inspections list and record each inspection against it. The list sorts the most urgent first and shows, per item, where it is, who inspected it last, when the next one falls due and the regulation setting the interval. Regulation 12 of the Work at Height Regulations 2005 sets no more than seven days between inspections of a working platform in construction work from which somebody could fall more than two metres, plus an inspection after anything that could have affected its stability. Estimark counts the days and flags the item red once it is past due. The history stays with the item.

  3. 03

    Who is fixing the thing somebody flagged?

    Whoever’s name is on the action. A near miss or an observation becomes a safety action with an owner, a due date and a priority that goes up to stop work. Closing it takes two people: one marks it done, a second verifies it. Overdue actions are counted at the top of the screen and shown in red, so nothing quietly ages.

    The safety actions list, with an overdue action to replace a missing toe board showing its owner and due date, and a done-then-verified close-out below it.
    The safety actions list, with an overdue action to replace a missing toe board showing its owner and due date, and a done-then-verified close-out below it.
  4. 04

    What else is held against the site?

    Inductions and toolbox talks against the person and the site. Permits to work, COSHH assessments and the asbestos register against the site, so they can be produced on request. Near misses, safety observations and accidents reportable from a phone. And a fire register whose muster roll reads off live attendance, so it lists who is on site now rather than who signed in this morning.

RAMS
Versioned, signed per operative, per version
Inspections
Interval and regulation stated on each item
Actions
Owner, due date, done then verified by a second person

What this step does not do

  • Estimark records evidence, dates and names. It doesn’t certify that you’re compliant and it doesn’t sign anything off on your behalf. The duties stay with the duty holders.
  • An F10 notification can be recorded against a project. Estimark doesn’t submit it to the HSE for you.
  • Inspection intervals ship as defaults matching the regulations named on the screen. Checking that the right cycle is on the right item is still a job for a competent person.

Questions

Safety, frequently asked

Does Estimark make my site compliant?

No. Estimark records evidence, dates and names. It doesn’t certify that you’re compliant and it doesn’t sign anything off on your behalf. The duties stay with the duty holders.

How often does a scaffold have to be inspected?

Regulation 12 of the Work at Height Regulations 2005 sets no more than seven days between inspections of a working platform in construction work from which somebody could fall more than two metres, plus an inspection after anything that could have affected its stability. Estimark counts the days and flags the item red once it is past due.

Snagging and handover software keeps the end of a job in one place, so Estimark holds the snags, the completion certificate, the handover pack and the defects liability period against the same job.

Build on a solid foundation.

Run the whole business without an implementation project and without legacy baggage. Every plan starts with 14 days free.

Estimating · Jobs · Invoicing · CIS · H&S · Reactive maintenance